• Reconstruction of Presby Road To Rowi Road,Adentan

    District : Adentan Budget : GHS 465,954.00

    The Presby road to Rowi road serves as the major road network which connects people living at New Legon, Commando, Fulani etc. all in Adenta to the main Madina to Dodowa main road.

    VIEW PROJECT
  • Rehabilitation of Irrigation Dam at Dawa

    District : Ningo Prampram Budget : GHS 570,903.00

    Dawa is a farming community in the Ningo Prampram District of the Greater Accra Region. The main source of water for farmers in this community is the irrigation dam. food crops grown in this area is notably vegetables.

    VIEW PROJECT
  • Construction of 6-unit classroom block for Anyaman Presby Prim.Sch.

    District : Ada West Budget : GHS 51,553.00

    Anyamam is a small community in the Ada West District of the Greater Accra Region with a population of about 6,464. One predominant schools in the area serving almost half of the school going population is the Presbyterian Primary school. It is located right in the middle of the community and hence a very good option for parents when they think of enrolling their children in basic school.

    VIEW PROJECT
  • Construction of 6-unit classroom block at Christian Methodist SHS, Aplaku.

    District : Ga South Budget : GHS 53,283.00

    Christian Methodist Senior High School was established in 1960 and has since been serving a number of Ghanaians. Currently, the school has a student population of about 2000 students from all over the country

    VIEW PROJECT
  • Partial Reconstruction of selected Roads At Ayawaso

    District : Accra Metropolitan Assembly Budget : GHS 925,882.00

    Road networks in Ayawaso are very important and busy roads connecting many important places in the Greater Accra Region. Notable among such road networks include the American House to Madina road, Tetteh Quashie to Shiashie road and some other roads in East Legon.

    VIEW PROJECT
  • Rehabilitation of Achimota Bypass Road to West Legon Accra

    District : Accra Metropolitan Assembly Budget : GHS 1,786,314.00

    The Achimota to West Legon Bypass branches from the N1 Highway through Kisseman to West Land and finally joins the Haatso to Atomic road .

    VIEW PROJECT
  • Rehabilitation of Odorna Garage Area &Tudu Roads

    District : Accra Metropolitan Assembly Budget : GHS 552,676.00

    The Odorna Garage area roads link link up with the Graphic road, Castle road and the Kwame Nkrumah Avenue.

    VIEW PROJECT
  • Rehabilitation of Lormnava Road (3.0km), Ga South

    District : Ga Central Budget : GHS 1,165,093.00

    The Lormnava road is the principal road running through the Lormnava township serving as the major means to places like Sowotoum, Ofankor and the Nsawam to Accra Highway.

    VIEW PROJECT
  • Emergency construction of storm drain and some related roads in Accra ...

    District : Accra Metropolitan Assembly Budget : GHS 568,525.00

    Miklin hotel is located in East Legon with the road networks connecting mostly streets in between households due to the residential nature of the area

    VIEW PROJECT

Become Volunteer

Become a community based volunteer, so you can update Oil Journey with the progress of projects happening in your local community.

Join Now

Ghana Gas strikes deal with Chinese company to construct gas pipeline

April 25, 2017, 8:52 p.m.Posted In : News

The Ghana National Gas Company (Ghana Gas) is to construct an onshore 278-kilometre natural gas pipeline infrastructure from the Takoradi Aboadze enclave to the power enclaves of Tema in the Greater Accra Region.

READ MORE

FPSO John Agyekum Kufuor arrives in country’s waters

April 11, 2017, 7:36 a.m.Posted In : News

The new Floating Production Storage and Offloading (FPSO) vessel, John Agyekum Kufuor, has safely arrived in the country’s waters.

It is currently being moored on top of wells at the Tano Basin Offshore Cape Three ...

READ MORE

Lloyd's, GOSCO JV to service Ghana's oil&gas sector

April 5, 2017, 9:49 a.m.Posted In : News

Lloyd’s Register, a global provider of engineering and technology-centric professional services, has signed an agreement with GNPC Operating Services Company (GOSCO) to form a joint venture dedicated to providing well project management, well engineering and ...

READ MORE
  • Response from community Read Below

    “This project is really interesting and for a good cause, we can now know whether the money they promised to use for projects is being put to proper use”

    Yaa Twum Farmer
  • Response from community Read Below

    “Oil Journey in the long future will be a data repository for Ghanaians to assess the performance of various governments”

    Anthony Yeboah CEO at Dizengoff Group
  • Response from community Read Below

    "We can now tell the quality of the project based on the budget assigned and see whether monies are being used rightly.”

    Thomas Clegg Fisherman